#. JEE Main 2020 examination would be conducted from July 18 to July 23, 2020. The examination will be conducted on July 18, 20, 21, 22, and 23, 2020 at various centres across the country.
BAPU ( MAHATMA GANDHI )
Do you know who Bapu was ? He was none other than Mahatam Gandhi. He was given
this name Bapu, meaning father, out of love and resp...
THE RAILWAY PORTER - ESSAY
Visit a railway station, and you are sure to see a porter the...ggage. If there is too
much luggage for a porter to carry, he uses a hand-car...
Notice : Admission O...Coaching In MSIPatna
JE...Coaching in MSI-Patna: Apply No...JEE MAIN - Coaching In P...Coaching -MSIPatna
J...English to students. T...t and among students en...k From MSI-Patna ). Targ...s needed by students such as d...tc.
NOTE : On...
Notice : Admission O...Coaching In MSIPatna
NE...Coaching in MSI-Patna: Apply Now
NEET - Coaching In P...Coaching -MSIPatna
N...English to students. T...t and among students en...k From MSI-Patna ). Targ...s needed by students such as d...tc.
NOTE : On...
NIOS Hindi (301) - New Syllabus - Sr. Secondary...of Hindi (301)-New...ow for details:...n PDF
PDF -Hindi...sp;
--
Tutor...ुण भक्तिकाव्य : कबीर और ज...3. रीतिकाव्य : बिहारी और...sp;
--...11. दो कलाकार : मन्नू...sp;
-...
Indigenous Technolog...Viksit Bharat ::
"...nnovation, self-reliance,...o Viksit Bharat:...an lead to cost-effective...al Technologies: India bei...ms, and drought-resistant...tion Technology: India&...ficient and eco-friendl...on Technologies: Te...
Rs 378 crore ::
According to a report by Indiatimes, the expected budget of Aditya L1 is Rs 378 crore. However, the total cost of this solar mission has not been released officially by ISRO yet.
Aditya-L1 is India's first dedicated scientific mission to study the sun. Earlier, this mission was conceived as Aditya-1 with a 400 kg class satellite carrying one payload, the Visible Emission Line Coronagraph VELC, and was planned to be launched in an 800 km low earth orbit.
ISRO ::
ISRO has shared the first images of the Aditya-L1 satelli...u which has now arrived at SDSC-SHAR, S...ota. PSLV-C57/Aditya-L1 Mission: Aditya-L1, the first space-bas...
The Aditya Mission that was conceptualised in 2008, was postponed numerous times due to budget crunch. Larsen & Toubro (L&T), known for its pivotal role in Chandrayaan, is also collaborating with ISRO on Aditya-L1 and Gaganyaan missions.
1.5 million kilometres ::
The spacecraft will travel 1.5 million kilometres ...get placed in a halo orbit around the Lagrangian point 1 (L1) of the Sun-Ear...
The Visible Emission Line Coronagraph (VELC) payload studie...f Coronal Mass Ejections. > The Solar Ultra-violet...he Solar Photosphere and Chromosphere in near Ultra-vio...
It's slated for launch on September 2, 2023. How much time will aditya l1 take to reach sun, specifically the L1 point? Aditya L1 will take approximately 4 months to reach the L1 point from its launch date.
About 1.5 million km ::
Aditya-L1 will go up to the First Lagrangian point, about 1.5 million km from the Earth, and transmit the data much of which will come t...